FENGJIU factory floor with rows of finished rideable luggage
OEM / ODM FACTORY · SINCE 2017

Inside the
building.

A 2,000 m² production base. Shells, wheels, electronics, assembly and packing under one roof — run by the same team that answers your emails.

SHOT ON THE FLOOR
NO STOCK FOOTAGE
2,000 m²Production floor
10Rideable platforms
80Export markets
35 daysProduction lead time
THE FLOOR

Not a showroom.
A working floor.

Most supplier pages show a lobby, a certificate wall and a render. This is the part buyers actually want to see: the shelves your shells arrive on, the benches your units are built at, and the cartons your order leaves in.

No separate assembly subcontractor. No black-box module from a trading company. The line that quotes your price is the line that builds your sample.

2017First export order
10 daysSample lead time
100 pcsMOQ per SKU
5Certifications

One base.
Four stages.

From incoming shell to sealed carton. Every stage happens in the same building, with the same QC team walking the line.

Black luggage shells staged in rows
Shell staging · incoming inspection
Shells & frames

The shell is
the product.

Injection shells, aluminum frames and foam liners are staged by color and size before assembly. Wall thickness, frame fit and surface finish are checked before a shell reaches the bench — not after the carton is sealed.

In-houseShell and frame assembly
100%Incoming visual check
Wheels & hardware

The parts that
fail first.

Wheel sets, hub motors and telescopic handles are kitted in-house. These are the components buyers complain about after the first season, so they are checked and matched here before they disappear into a shell.

In-houseWheel and handle kitting
BatchMotor and handle traceability
Rows of luggage wheels and telescopic handles
Wheel and handle kitting
Worker assembling a red rideable suitcase at a bench
Assembly bench · frame, wiring, wheels
Assembly

Built by hand.
Checked on the line.

Each unit is assembled at a fixed station: frame, wiring, handle, wheels, then a ride test. The same station that builds the unit checks it before it moves to packing, so a fault is caught while the fix is still one bench away.

Fixed stationOne builder, one unit
Ride testBefore packing
Packing & dispatch

Packed the way
you sell it.

Retail carton, pallet or mixed container. Packaging drawings and carton marks are approved before the run, and every carton carries a size and color label that matches the SKU list you sent us.

Retail / palletCarton formats
Pre-approvedArtwork and carton marks
Finished luggage packed in cartons on the factory floor
Finished goods · retail carton and pallet
QC / TEST

What we check
before it ships.

Not a QC sticker at the end of the line. Four checks that catch the failures buyers actually report after the first container.

Telescopic handleFull extension, lock, release and return — under load.
Wiring & batteryConnector continuity, charger cut-off and USB output.
Wheels & frameSpin, alignment, brake and frame-lock play.
Ride & packingLoaded ride test, then carton drop and label check.
Reports available on request · CE / FCC / UN38.3 / TSA / MSDS
Close-up of hands checking wiring inside a rideable suitcase

Walk the line.

Sixty seconds, nine stations, no cuts to stock footage. Sound off — the chapter line below tells you what you are looking at.

MaterialIncoming shell WheelsKitting & motor AssemblyFrame & wiring TestingHandle & ride PackingCarton & pallet
Filmed on the FENGJIU floor in 2026. The full walkthrough is 62 seconds; no music, no voice-over. Book a live walkthrough ↗
FOR OVERSEAS BUYERS

See it live.
Not a slide deck.

A video call, not a sales presentation. We will open the line, pull a unit off the shelf and answer the questions your buyer will ask before placing the PO.

Mon–Sat · 09:00–18:00 CST · English / 中文
CE · EU market FCC · US market UN38.3 · Battery transport TSA · Cabin configuration MSDS · Battery documentation